Due to the ban on fluorescent lamps and the ambition to save energy, the lighting in the Innovation Park of a leading telecommunications company in Düsseldorf had to be replaced.
A classic renovation was out of the question: the metal slatted ceiling was not to be damaged or modified. Where others wanted to modify the ceiling, ETAP was able to work with what was already there.
ETAP offered a circular solution tailored to the existing situation:
The offices remained in use as usual during installation. Because ETAP reused the existing luminaires and cabling, there was no breaking work, dust or noise nuisance. The result: a fast, circular LED renovation with energy savings and no impact on the building or its users.
Other suppliers required modifications to the ceiling or replacement of the entire luminaires. ETAP, on the other hand, was able to offer an efficient LED refurbishment without any breaking or disruption.
To guarantee that the new LED modules would fit perfectly into the existing luminaires, ETAP first developed customised prototypes. This allowed the client to see and test in advance what the solution would look like and how smooth the installation would be. The prototypes were available within a few weeks, giving the client quick assurance of technical and aesthetic feasibility.
Discover more about circular renovations? Read more about refurbishment here.
Product sheet