The Solarwind office complex, built in 2013, was designed from the outset with energy efficiency as a priority. ETAP then supplied custom luminaires with integrated lighting management for maximum comfort and energy savings.
In 2024, the client chose ETAP again: this time to upgrade the existing lighting to energy-efficient LED technology, without structural modifications to the building.
After more than a decade, some of the lighting no longer met current requirements. Especially the European ban on fluorescent lamps made an LED upgrade necessary. At the same time, maintenance costs rose and technical maintenance became increasingly complex.
A classic renovation was out of the question:
● The ceiling had to stay to preserve the original look,
● offices were to remain in use during the works.
The client again wanted lighting with sensors for daylight and presence to further reduce energy consumption
ETAP worked out a circular solution fully tailored to the situation:
Thanks to this smart update, the building still meets the requirements of sustainability labels BREEAM, HQE and DGNB. Those international labels assess buildings on energy consumption, use of materials and comfort.
With this project, ETAP proves that it is perfectly possible to renew lighting without breaking work, without waste and without disruption. The client is satisfied with the result and with the convenience of the new controls.